Installing honey bees is how a beginner starts a colony. Most people start with one of two kinds of bees: a package, which is a box of loose worker bees with a separate queen, or a nucleus colony, usually called a nuc, which is a small working colony already on frames. Either can work. The install itself takes a few hours. The first few weeks, while the colony settles in, matter more.
This guide covers the choices to make before pickup, what the install involves, and the checks that show whether the new colony is doing well.
Package or nuc
A package holds about 3 pounds of worker bees, often cited as roughly 10,000 to 12,000 bees. It also has a mated queen in her own small cage and a can of sugar syrup. A package has no brood and no comb, so the bees have to build wax comb and raise their own young from scratch.
A nuc is an established colony in a small box. A typical nuc has five frames, usually with brood (eggs, larvae and sealed pupae), stored food, bees and a laying queen. Nucs often cost more than packages, and they usually get going faster because the colony is already growing.
Packages are often cheaper, and they can suit you if you use a non-standard hive or want to order early. Nucs usually fit a standard Langstroth hive and suit a beginner who wants a faster start. The trade-offs deserve a careful look, and our side-by-side on package bees vs nuc which is better goes through them in more detail.
Catching a swarm is another way to get bees. It costs nothing, but it is unreliable and you do not control the timing. If you are offered one, see how to catch a honey bee swarm.
Choose the timing
New colonies are usually installed in spring, once the weather has settled and flowers are beginning to offer nectar and pollen. Many suppliers sell on a set schedule. In many areas, beekeepers place their orders in winter, sometimes months before pickup. When to order honey bees covers that timing in more detail.
On install day, pick a mild, calm day. Some extension guides suggest installing when daytime temperatures are around 65°F (18°C) or warmer. Bees that sit in a hot vehicle for hours are at risk, so plan to get them into the hive promptly.
Get the hive and site ready
Assemble the hive and set it in its final place before the bees arrive. Moving a colony later can confuse foragers, so choose the spot first. If you have not chosen one yet, think about where to put a beehive in your backyard: morning sun, a clear flight path in front of the entrance, and a quiet spot away from heavy foot traffic.
Have these ready before pickup:
- Frames with foundation or drawn comb, plus a few spare frames.
- An entrance reducer, or a strip of wood to narrow the entrance.
- A feeder and sugar syrup, made at a 1:1 ratio.
- A hive tool, a smoker, a bee brush, a veil and gloves.
If you still need to choose and build equipment, start with how to set up a backyard beehive. For what each tool does, the beekeeping tools for beginners list is a practical place to look.
Bee stings can cause severe allergic reactions in some people. If you have had serious reactions to stings before, talk with your doctor before you keep bees.
To make the syrup, stir one part white granulated sugar into one part warm water, by weight or volume, until the sugar dissolves. Let it cool before feeding. Avoid brown sugar and never feed honey from an unknown source, since it can carry disease.
Installing a package
A package install means shaking the bees from their box into the hive, placing the queen cage between frames, and letting the workers release her over a few days. You remove a few middle frames to make room, handle the package gently, and keep the queen cage out of the sun. For each step, see how to install a package of bees.
Installing a nuc
A nuc install moves the frames from the nuc box into your hive, in the same order, and then fills the open space with frames. The brood stays together and the bees already have comb to work on. The full steps are in how to install a nuc in a beehive.
The first two weeks
Once the bees are in, keep feed available. Packages usually need more feeding for longer, since they have no stores and must build comb. Check the feeder regularly. How to feed a new bee colony covers the amounts, the feeders and the signs to watch for.
Plan a queen check. About five days after a package install, confirm the queen has been released from her cage. About a week after that, look for eggs. Eggs are small, white and shaped like a grain of rice, standing upright in the cells, and they show she is laying. For the details, see how to check queen after installing package bees. If you want to see the queen herself, learn how to find the queen bee in a hive, but eggs are the more reliable sign.
Keep inspections short and calm. Each time you open the hive, you disturb the colony. For the mechanics of opening a hive without causing trouble, see how to open a beehive for inspection.
Problems to watch for
Some new colonies fail or reject their queen. Extension sources report that a sizable share of new package colonies do either, with one estimate between 20 and 50 percent. If you see no eggs when you expect them, act early. A colony that raises a replacement queen can lose several weeks.
Absconding is another risk. Sometimes a whole new colony leaves the hive. Heat, poor food, disturbance and pests can all contribute. Why did my new bees leave the hive? That question has its own article, which covers the usual causes and what to check first.
Mites can come with the bees or build up later in the season. Plan for mite checks from the first year. How to control varroa mites in beehive lays out a full plan.
Expect a slow first year
Will a new beehive produce honey first year? Usually not much. A package spends its first season drawing comb and raising brood, and even a nuc may need time before it has surplus to spare. Treat the first year as a year of building the colony.
Later in the season, watch for swarming. A strong colony can swarm even in its first year, and the options are laid out in how to prevent bees from swarming. As the year winds down, the steps in how to prepare a beehive for winter help a colony get through the cold.